Compaction and waste are separate allowances, density is visible and editable, and bags or truckloads appear only when you enter their size.
How to use the gravel calculator
- Pick a project type to get a typical depth and material, or keep General.
- Add each area with its shape and measurements.
- Enter the depth of the gravel layer.
- Check the material density — replace it with your supplier's figure if you have one.
- Set compaction and waste, then optionally add bag size, truck capacity and price.
Gravel depth
Most decorative beds and paths need 2–3 in of gravel. A driveway top layer is usually 4–6 in over a compacted base, and a French drain trench is often 12–24 in deep. For deeper jobs, calculate each layer separately with its own material.
| Use | Typical depth | Common material |
|---|---|---|
| Garden beds, mulch replacement | 2–3 in (5–8 cm) | River rock, decorative |
| Paths and patios | 2–3 in (5–8 cm) | Pea gravel |
| Driveway top layer | 4–6 in (10–15 cm) | Crushed stone |
| Driveway base | 4–8 in (10–20 cm) | Crushed stone with fines |
| French drain | 12–24 in (30–60 cm) | Washed crushed stone |
Density and weight
Gravel is sold by volume (cubic yards or cubic meters) or by weight (tons or tonnes). Converting between them needs the bulk density, which depends on stone size, shape, moisture and supplier. A common rule of thumb is about 1.4 US tons per cubic yard (about 1.66 t/m³), but always prefer your supplier's figure.
Compaction
Crushed stone with fines settles noticeably when compacted, so you need more loose material than the finished volume. The compaction allowance is applied separately from waste so you can see why the order grows.
Bags versus bulk
Bags are convenient for small jobs; bulk delivery is usually cheaper above about one cubic yard. The calculator shows bags and truckloads only when you enter their size, because both vary by store and supplier.
Gravel calculator formulas
- Rectangle
length × width- Circle
π × radius²- Ring
π × (outer radius² − inner radius²)- Trench
trench length × trench width- Volume
total area × depth- Adjusted volume
volume × (1 + compaction % ÷ 100) × (1 + waste % ÷ 100)- Weight
adjusted volume × bulk density- Bags
round up(weight ÷ bag weight) or round up(volume ÷ bag volume)- Loads
round up(weight or volume ÷ load capacity)
Worked example
- A 10 × 10 ft area at 3 in deep: 100 sq ft × 0.25 ft = 25 cu ft = 0.926 cu yd.
- 5% waste: 0.926 × 1.05 = 0.972 cu yd.
- At 1.4 tons per cu yd: 0.972 × 1.4 = 1.36 tons (about 2,722 lb).
- In 50 lb bags: 2,722 ÷ 50 = 54.4, rounded up to 55 bags.
Assumptions
- Depth is the same across all areas.
- Densities are typical loose bulk densities; real material varies.
- Compaction and waste are separate multipliers.
- Cost uses the exact quantity for bulk prices and whole bags for bag prices.
- Bags and loads are counted only when you enter their size.
Frequently asked questions
How do I calculate how much gravel I need?
Multiply the area by the depth to get the volume, add allowances for compaction and waste, then multiply by the density to get the weight. The calculator does each step and shows the formula with your numbers.
How many tons of gravel are in a cubic yard?
Roughly 1.4 US tons for typical gravel, but it ranges from about 1.25 to 1.5 tons depending on stone size and moisture. Use your supplier's figure for an accurate order.
How many bags of gravel make a cubic yard?
A cubic yard of gravel weighs about 2,800 lb, so it takes around 56 bags of 50 lb, or 54 bags of 0.5 cu ft. Enter your bag size to get an exact count.
How deep should gravel be for a driveway?
Usually 4–6 in of crushed stone over a compacted base of 4–8 in. Soft ground or heavy vehicles need more; local practice varies.
How much gravel do I need for a French drain?
Choose the Trench shape, enter the trench length and width and the gravel depth. Subtract the volume of the pipe if you want a tighter estimate.
Should I add extra for compaction?
For crushed stone with fines that you will compact, add about 10–15 %. Washed stone and pea gravel barely compact, so 0–5 % is usually enough.